Scope of Work: Provide labor and materials to build a varying width (6-8 foot wide) 2,070 lf /- concrete pathway from Winter Wheat to the southwest corner of Woodlands Parkway including but not limited to manufacture and install pathway stop signs, crosswalks, ADA compliant bridges, pathway grates and ramps, a pedestrian crossing, cautionary stencils, and clearing and grading.
|